modelEquipmentSchedule
Example model with a schedule that overrides a schedule in EnergyPlus
Extends from Buildings.ThermalZones.EnergyPlus_24_2_0.Examples.SingleFamilyHouse.Unconditioned.
Information
Example model that demonstrates how to override a schedule in EnergyPlus.
The model overrides the EnergyPlus schedule INTERMITTENT,
which is used by EnergyPlus to control the equipment in the thermal zone.
Components
| Type | Name | Default | Description |
|---|---|---|---|
| Buildings.ThermalZones.EnergyPlus_24_2_0.Schedule | schInt | Block that writes to the EnergyPlus schedule INTERMITTENT | |
| Buildings.Controls.OBC.CDL.Reals.Sources.Pulse | intLoaFra | Schedule for fraction of internal loads |
Revisions
-
May 21, 2020, by Michael Wetter:
First implementation.