modelEquipmentSchedule

Example model with a schedule that overrides a schedule in EnergyPlus

Extends from Buildings.ThermalZones.EnergyPlus_24_2_0.Examples.SingleFamilyHouse.Unconditioned.

Information

Example model that demonstrates how to override a schedule in EnergyPlus. The model overrides the EnergyPlus schedule INTERMITTENT, which is used by EnergyPlus to control the equipment in the thermal zone.

Components

TypeNameDefaultDescription
Buildings.ThermalZones.EnergyPlus_24_2_0.ScheduleschIntBlock that writes to the EnergyPlus schedule INTERMITTENT
Buildings.Controls.OBC.CDL.Reals.Sources.PulseintLoaFraSchedule for fraction of internal loads

Revisions

  • May 21, 2020, by Michael Wetter:
    First implementation.